Captive generation, no grid queue
Phase One at peak load uses about 39% of installed generation, leaving 2.6× headroom for expansion.
- Not counted against PLN grid allocation
- ~$0.088/kWh delivered power
- 99.99% monthly availability SLA
A 200MW AI data center campus with 640MW of captive generation, a private reservoir and a sub-2ms fibre route to Singapore.
Across Southeast Asia, new capacity is waiting on grid queues, water permits and land assembly. Bintan brings all three inside one industrial boundary.
Phase One at peak load uses about 39% of installed generation, leaving 2.6× headroom for expansion.
Annual cooling make-up of 1.5–2.2M m³ is only 6–7% of reservoir capacity, more than 8× drought headroom.
Clear title and utilities in place, with reserve land banked for 500MW+ and a long-range 1–3GW vision.

Four standardised 50MW data halls sit east and west of a central generator spine. Water infrastructure runs along the north edge; the substation and operations building sit to the south.
Every hall sees the same distance to power, the same water head and the same fibre path.
Regional approvals now favour projects that self-supply power and water. Bintan meets that test today rather than waiting for upgrades.
Share of state power used by data centers; new grid connections pushed to 2028–2031.
Projects frozen while grid capacity is reassessed.
Total grid capacity, dependent on future PLN upgrades.
Typical grid expansion and queue time avoided by captive generation.
Capacity arrives in deliberate steps so partners can align investment, equipment and commissioning.
Feasibility closed, water permits, M&E drawings frozen.
Grading, dedicated feeders and hall structures begin.
Initial halls energised for early customers.
All four Phase One halls ready for service.
Expansion toward a regional AI super-cluster.
From a single 2.5MW hall unit to a dedicated building, the commercial model follows your deployment plan.
Whole halls (20MW) or whole buildings (50MW), customised and delivered ready to deploy.
Discounted base capacity plus a share above a baseline, with an inference optimisation team.
For alumina, chemical and advanced manufacturing operators inside the SEZ.
Walk the captive plant, the reservoir edge and the Phase One hall plots with our project team.