Daylight concept of the Bintan AI campus with four data halls beside a reservoir
Galang Batang SEZ · Bintan Island · Indonesia

Power, water and land, secured for AI.

A 200MW AI data center campus with 640MW of captive generation, a private reservoir and a sub-2ms fibre route to Singapore.

200MWPhase One IT capacity across four 50MW halls
640MWCaptive generation already built on site
30Mm³Private reservoir, 20m from the campus fence
<2msRound trip to Singapore over subsea fibre
Why Bintan

The three inputs that decide AI delivery are already here.

Across Southeast Asia, new capacity is waiting on grid queues, water permits and land assembly. Bintan brings all three inside one industrial boundary.

01 / Power 640MW

Captive generation, no grid queue

Phase One at peak load uses about 39% of installed generation, leaving 2.6× headroom for expansion.

  • Not counted against PLN grid allocation
  • ~$0.088/kWh delivered power
  • 99.99% monthly availability SLA
02 / Water 30M m³

A reservoir of our own

Annual cooling make-up of 1.5–2.2M m³ is only 6–7% of reservoir capacity, more than 8× drought headroom.

  • Closed-loop primary cooling
  • No competition with community supply
  • 10,000m³ on-site tank buffer
03 / Land 30–40ha

Serviced land, ready to build

Clear title and utilities in place, with reserve land banked for 500MW+ and a long-range 1–3GW vision.

  • No resettlement or acquisition friction
  • Immediate construction readiness
  • Phased, repeatable 50MW blocks
Aerial concept of the Phase One campus masterplan
Phase One masterplan · concept
Campus at a glance

Four halls around one power spine.

Four standardised 50MW data halls sit east and west of a central generator spine. Water infrastructure runs along the north edge; the substation and operations building sit to the south.

Every hall sees the same distance to power, the same water head and the same fibre path.

Data halls
4 × 50MW · 3 floors · 22m
Backup generation
80 × 2,500kW gensets
Fuel storage
48h at full load, below grade
Substation
220kV, dual route
Water tanks
8 × 1,250m³ = 10,000m³

See the facility

Market shift

Bring your own power and water is the new entry ticket.

Regional approvals now favour projects that self-supply power and water. Bintan meets that test today rather than waiting for upgrades.

24%Johor

Share of state power used by data centers; new grid connections pushed to 2028–2031.

100+Thailand

Projects frozen while grid capacity is reassessed.

<1GWBatam

Total grid capacity, dependent on future PLN upgrades.

3–5yrsBintan skips

Typical grid expansion and queue time avoided by captive generation.

Delivery roadmap

24 months to a full 200MW.

Capacity arrives in deliberate steps so partners can align investment, equipment and commissioning.

  1. Design freeze

    Feasibility closed, water permits, M&E drawings frozen.

  2. Site works

    Grading, dedicated feeders and hall structures begin.

  3. First 50–100MW

    Initial halls energised for early customers.

  4. 200MW ready

    All four Phase One halls ready for service.

  5. 1–3GW vision

    Expansion toward a regional AI super-cluster.

Ways to work with us

Three entry points into the campus.

From a single 2.5MW hall unit to a dedicated building, the commercial model follows your deployment plan.

Hyperscalers & cloud

Wholesale & build-to-suit

Whole halls (20MW) or whole buildings (50MW), customised and delivered ready to deploy.

  • 5+X year terms
  • Dedicated access and isolation
  • Pre-installed M&E and network
Industrial partners

Embodied AI co-creation

For alumina, chemical and advanced manufacturing operators inside the SEZ.

  • Data capture to local deployment
  • Training on real production data
  • Robot control policy datasets
Start the conversation

See the campus before you commit.

Walk the captive plant, the reservoir edge and the Phase One hall plots with our project team.

Continue the briefRegion